Project Planet - Earth vs Humanity

Click the "Install Game" button to initiate the free file download and get compact download launcher. Locate the executable file in your local folder and begin the launcher to install your desired game.
| a game by | Fifth Harbour Studios |
| Platform: | PC (2023) |
| User Rating: | 10.0/10 - 1 vote |
| Rate this game: | |
| Updated: | Jan 10, 2025 |
| See also: | Survival Games, Games Where Choices Matter, Turn Based RPGs, PvP Games, Space Games, Board Games, Dystopian Games, Political Games |
Project Planet - Earth vs Humanity is a simulation of the well-known confrontation. Planet Earth vs Humanity. Will you destroy humanity or will you be able to appease nature with your right and timely decisions? Play for both sides and choose the most correct ways of destruction and survival.
The game offers co-op for up to six people, each of whom will fulfill a special social role or become Mother Earth. Play with friends or against artificial intelligence. There are no barriers or conditions, each new party is unique in its own way.
Pros of the game:
- Ability to control the cataclysms of an entire planet
- Manage public spheres: politics, media, science and even trade
Download Project Planet - Earth vs Humanity
PC
System requirements:
- PC compatible
- Operating systems: Windows 10/Windows 8/Windows 7/2000/Vista/WinXP
Snapshots and Media
PC Screenshots
Similar Games
Viewing games 1 to 8





















Asterogues
Drift Abyss
Moon Mystery
Shoulders of Giants
Star Farmer: Prologue
Star Farmer: Warlock of the Universe
Star Trek: Infinite
Starri
FNIA After Hours
Orion Sandbox Enhanced
Parasocial
Resident Evil 4 - Separate Ways
Half-Life 2: Episode One
Primal Earth
Day of Dragons
The Parasites
War of the Worlds
Condemned 2: Bloodshot
SurrounDead
Power Drill Massacre